Sign in

Energy

Power, Grid and Utility Rate News and Resources

Monday, November 23, 2026 Online Edition

News

Documents

Guides, filings and records. Download the originals.

DOCX
SWIP-N: Who Owns It, Who Governs It, and What the Latest FERC and CAISO Actions MeanSeries: SWIP-N · Part 250 KB · October 2025 brief on the Southwest Intertie Project-North: the Great Basin Transmission and LS Power ownership split, CAISO control of capacity, and the block tied to Idaho Power.
DOCX
Silver Spur and the South Hills Gas Plant: Research BriefSeries: South Hills - Milner Project · Part 3630 KB · Compiled Nov. 20, 2026. Gas route, fuel math, pipeline capacity, equipment and timeline for the Silver Spur pipeline and Idaho Power's South Hills plant near Milner Dam.
DOCX
Twin Falls County Wrote Gas Out: Energy Code Brief (Rev. 1.2)Series: South Hills - Milner Project · Part 377.9 MB · Research brief and evidence record, Nov. 19, 2026. Shows how natural gas power plants dropped out of Twin Falls County's energy code between 2022 and 2026, and why the South Hills plant is moving ahead on a building permit alone.
DOCX
Legislative Briefing: Idaho State Energy Sovereignty (HCR 32)19 KB · Summary of House Concurrent Resolution 32, which sets out an energy sovereignty framework for Idaho: ratepayer protection, in-state base load generation and standards for new transmission.
DOCX
Milner Area Power Projects Briefing (Rev. 4)Series: South Hills - Milner Project · Part 331.5 MB · Briefing guide, status as of Nov. 18, 2026. Quick answers and the full record on the power projects around Milner Dam, including where the Idaho Public Utilities Commission case stands.
DOCX
Milner Area Power Projects Briefing, Addendum A: Twin Falls County RecordsSeries: South Hills - Milner Project · Part 3422 KB · Addendum to Briefing rev 4, status as of Nov. 18, 2026. What Twin Falls County's own records show about the Milner gas plant, what follows for neighbors and the county, and a legal and ethical analysis.
DOCX
Milner Gas Power Plant (South Hills): Briefing Addendum 1 (Rev. 2)Series: South Hills - Milner Project · Part 3531 KB · Supplement to the Milner Area Power Projects Briefing rev 4, status as of Nov. 18, 2026. Collects what turned up after rev 4: the gap review downloads, the Twin Falls County records search and the gap audit.
DOCX
BESS Technology, Safety and Community Impact Briefing54 KB · March 2026 reference for communities facing battery energy storage proposals. Covers the technology, failure events sorted by risk category, safety systems and community impact.
DOCX
Milner Gas Power Plant: Accountability Findings, Executive SummarySeries: South Hills - Milner Project · Part 3111 KB · Research file, status as of Nov. 18, 2026. Summarizes 21 findings from the public record on Idaho Power's 222 MW South Hills gas plant near Milner Dam, nine of them rated high severity.
DOCX
The Regulation of Energy Production in Twin Falls County (Rev. 1)Series: South Hills - Milner Project · Part 3248 KB · Research brief current to Nov. 19, 2026. Traces the legislative history of Twin Falls County's energy rules and Ordinance 282, and tests whether the 222 MW South Hills gas plant near Milner Dam is subject to discretionary land-use review.
DOCX
Legitimate Limits on Energy and Data Center Development13 KB · July 2026 brief on which limits on energy and data center growth are legitimate, on private land and on public land, measured against constitutional authority, two views of liberty, and ordered liberty.
DOCX
BAAJA in the Senate: The Nov. 18, 2026 Votes14 KB · Briefing on the three Senate roll calls of Nov. 18, 2026 that cleared the last 60-vote hurdle for the Bipartisan American Affordability and Jobs Act, including the 65-31 final cloture vote and what has to happen next.
PDF
Milner -South Hills BriefingSeries: South Hills - Milner Project · Part 384.3 MB · The Milner gas power plant briefings compiled into one PDF, revision 3. Covers the plant proposed near Milner Dam, also known as the South Hills project, and the places where the public record on it conflicts.
PDF
Milner Gas Power Plant (South Hills): Inconsistencies in the RecordSeries: South Hills - Milner Project · Part 1147 KB · Mini brief · Revision 2, status as of Nov. 19, 2026. Statements in the record set side by side that can't both be fully right as written, and which ones the record now settles.
PDF
Milner Gas Power Plant (South Hills): Expanded BriefingSeries: South Hills - Milner Project · Part 21.5 MB · Research file · Revision 3, status as of Nov. 19, 2026. Quick answers and the full record on Idaho Power's 222 MW gas plant next to Milner Dam: what it is, where the PUC case stands, the permits, the pipeline and the open questions.
PDF
Idaho's Data Center, Nuclear and Energy Decisions, 2016 to 2026708 KB · Report · Revision 5, November 2026. The deals made in Idaho's name, and the say Idaho still has left. A state, regional and national report on a decade of data center, nuclear and energy decisions.
PDF
Guide 1: Who Pays When a Data Center Falls ThroughSeries: Guides · Part 2407 KB · Booklet · Idaho Data Center Public Guide 1 of 9 · Version 7. Idaho Power builds lines and buys power for a data center before it pays a single bill. If the data center leaves early, somebody covers what's left. This guide shows who, and how to keep it from being you.
PDF
Guide 2: What Operating Data Centers DeliveredSeries: Guides · Part 4385 KB · Booklet · Idaho Data Center Public Guide 2 of 9 · Version 6. Jobs, taxes and public costs after the ribbon cutting, from Meta's campus near Boise to Oregon and Virginia, and how to check the next promise.
PDF
Guide 3: What Idaho Counties Can Enforce on Data CentersSeries: Guides · Part 6387 KB · Booklet · Idaho Data Center Public Guide 3 of 9 · Version 6. Where a county's zoning power is strong, where state agencies take over, and how to write conditions an inspector can actually check.
PDF
Guide 4: Farmland Doesn't Come Back EasySeries: Guides · Part 8311 KB · Booklet · Idaho Data Center Public Guide 4 of 9 · Version 8. What happens to farm ground and sagebrush after solar, wind and data center projects are built and torn down, and why Idaho should keep them off its best land in the first place.
PDF
Guide 10: Eminent Domain in Idaho, and What BAAJA Would ChangeSeries: Guides · Part 20397 KB · Booklet · Idaho Data Center Public Guide 10 · Version 1. Who can take Idaho land today, how the process works, and how a federal permitting bill now in the House would let power line developers condemn rights-of-way in federal court.
PDF
From Server Rooms to National Strategy (Slides)1.8 MB · 10-slide deck, PDF. The slides behind the From Server Rooms to National Strategy video: the four kinds of data centers, U.S. data center electricity use from 2014 to a 2028 projection, the 2025 federal strategy, the June to September 2026 rhetoric about opponents, the Economist/YouGov poll and a free-market view. Each slide lists its source.

Video, Audio and Images

Videos

Milner Gas Plant: Next DoorVertical video, 1:41. Idaho Power's gas plant of up to 222 megawatts, now filed as South Hills, would sit on a 20-acre parcel next to Milner Dam. Idaho Power testified Twin Falls County requires only a building permit, and the farm zone rules the county adopted in August 2026 list public utility buildings as a permitted use. Twin Falls County commissioners: 208-736-4068. Narrated by Laurel, an ElevenLabs voice.Download video
Milner Gas Plant: Idaho Power Changed the NameVertical video, 1:38. The PUC's two formal notices never say Milner or Twin Falls County. The same plant went from "Milner 60 MW BESS" to "Milner gas resource" to "South Hills," the name of the mountains south of Twin Falls. To follow it, search both names in state case IPC-E-26-04. Narrated by Laurel, an ElevenLabs voice.Download video
Milner Gas Plant: 88 Percent From the Biggest CustomersVertical video, 1:52. Idaho Power says the plant serves the Magic Valley. Its own forecast, per PUC staff, has the largest-customer class growing from 258 to 875 average megawatts by 2030, 88 percent of all system growth, with Micron's fab about 445. Comments on large-load costs in IPC-E-26-07 are due Dec. 14. Idaho PUC: 208-334-0300. Narrated by Laurel, an ElevenLabs voice.Download video
Milner Gas Plant: Eminent Domain on the Table, Dec. 9Vertical video, 1:48. The Silver Spur pipeline would run about 88 miles of 24-inch pipe from Elko County, Nevada, to Twin Falls County, with Idaho Power reported at 175,000 of about 275,000 dekatherms a day. FERC's scoping session is Dec. 9, 5 to 8 p.m., in Twin Falls; written comments are due Dec. 14 on docket PF26-15. Check the docket before you go. Narrated by Laurel, an ElevenLabs voice.Download video
Milner Gas Power Plant, Part 1: What's Coming to Milner DamMini documentary, 5:54, widescreen. Part 1 of 4 on the gas plant of up to 222 megawatts that Idaho Power now calls South Hills, below Milner Dam: what is planned, why the name changed, the Silver Spur pipeline that would feed it, and what Idaho Power has said about who the power is for. Narrated by Laurel, an ElevenLabs voice.Download video
Milner Gas Power Plant, Part 2: The Normal Road, and the One Milner TookMini documentary, 8:05, widescreen. Part 2 of 4 walks through the normal permitting road for a power plant in Idaho (PUC certificate, county land use, air permit, federal license) and where the Milner project took a different path, including a draft federal filing sent to eight organizations with no county office and no neighbors. Narrated by Laurel, an ElevenLabs voice.Download video
Milner Gas Power Plant, Part 3: The Paper TrailMini documentary, 7:15, widescreen. Part 3 of 4 follows the paper trail on the Milner gas plant, with names and page numbers: testimony, staff comments, county records and the land transfer to Idaho Power, plus H.B. 911, the 2026 law that makes a new load of 50 megawatts or more responsible for its full cost of service. Narrated by Laurel, an ElevenLabs voice.Download video
Milner Gas Power Plant, Part 4: Questions That Need AnswersMini documentary, 5:13, widescreen. Part 4 of 4 lists the open questions on the Milner gas plant, who should answer them and how to ask, from the PUC and Twin Falls County to DEQ's coming air permit. Questions put in writing become part of the record, answered or not. Narrated by Laurel, an ElevenLabs voice.Download video

Audio

Public Land, Less Public Say (Audio)Audio narration of the Public Land, Less Public Say video, 2:21, MP3. On Nov. 10, 2026, the BLM proposed a rule that would drop the 90-day comment period on draft land-use plans and cap any comment period at 30 days, with no more than 30 days added. Comments close Jan. 11, 2027 (docket BLM-2026-0298). Narrated by Laurel, an ElevenLabs voice.Download
Solar for the Servers (Audio)Audio narration of the Solar for the Servers video, 4:52, MP3. In January 2025 the BLM took public input on Arevia Power's Taurus Wind and Snake River Energy solar projects in Gooding, Jerome and Lincoln counties. BLM officials now tie that solar farm to Rhea Data's proposed data center south of Boise. Narrated by Laurel, an ElevenLabs voice.Download

Images

From Server Rooms to National Strategy: The Evolution of U.S. Data Centers
U.S. data center electricity use, the four kinds of data centers and the 2025 federal timeline

Hearings, comment deadlines, town halls and public meetings.

No upcoming events posted yet.

Take Action

RSS Feed

Every new story, link and document in Energy, in your feed reader. No account, no email list.

Subscribe to the events calendar (.ics)